Wednesday, January 5, 2011

Still Slated for Destruction

McDonogh No. 11 School

The plans for the UMC Hospital Footprint still call for large areas of surface-level parking, not actual hospital building.  If the political willpower existed, the design could be reconfigured on the existing footprint to avoid the demise of the school.

1 comment:

  1. The acronyn NOCHC on the side of the building stands for the following:

    N-ew
    O-rleans
    C-enter
    [for]
    H-ealth
    C-areers

    How much FEMA and recovery funding was sought and/or applied to this public biomedical school's post-K renovation?

    Why was a health-related public school within GNOBEDD boundaries renovated only to be repurposed for non-medical use and ultimately slated for demolition?

    ReplyDelete